The impact of failure predictive information in maintenance planning in the aviation industry

Baptiste Bovyn Tom Servranckx
Persbericht

De impact van real-time sensordata in onderhoudsplanning binnen de luchtvaartindustrie

Het artikel werd opgesteld in Latex tekstverwerker en kan bijgevolg niet gekopieerd en geplakt worden. Gelieve het artikel als pdf-bestand in de bijlage terug te vinden, a.u.b.

Bibliografie

U. Besikci, U. Bilge & G. Ulusoy (2015). Multi-mode resource constrained multi-project

scheduling and resource portfolio problem. European Journal of operational Research,

240:22{31.

J. Clausen (1999). Branch and bound algorithms - principles and examples. Department of

Computer Science, University of Copenhagen, Universitetsparken 1, DK- 2100 Copenhagen,

Denmark.

E. Demeulemeester & W. Herroelen (1992). A branch-and-bound procedure for the multiple

resource-constrained project scheduling problem. Management Science, 38(12):1803{1818.

S. Hartmann (2001). Project scheduling with multiple modes: a genetic algorithm. Annals

of Operations Research, 102:111{135.

W. Herroelen, B. De Reyck & E. Demeulemeester (1998). Resource-constrained project

scheduling: a survey of recent developments. Computers Ops Res., 25(4):279{302.

F. S. Hillier & G. J. Lieberman (2015). Introduction to Operations Research. McGraw-Hill

Education, 10 edition.

L. Homann, T. Kuprat, C. Kellenbrink, M. Schmidt & P. Nyhuis (2017). Priority rule-based

planning approaches for regeneration processes. Procedia CIRP, 59:89{94.

S. Hogan (2011). A gentle introduction to computational complexity theory, and a little bit

more. http://www.math.uchicago.edu/~may/VIGRE/VIGRE2011/REUPapers/Hogan.pdf.

C. Kellenbrink & S. Helber (2015). Scheduling resource constrained projects with a 

exible

project structure. European Journal of Operational Research, 246:379{391.

C. Kellenbrink, F. Herde, S. C. Eickemeyer, T. Kuprat & P. Nyhuis (2014). Planning the

regeneration processes of complex capital goods. Procedia CIRP, 24:140{145.

U. Kohlmorgen, H. Schmeck & K. Haase (1996). Experiences with ne-grained parallel genetic

algorithms. http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.45.8861&

rep=rep1&type=pdf.

 

R. Kolisch (1996). Serial and parallel resource-constrained project scheduling methods revisited:

theory and computation. European Journal of Operational Research, 90:320{333.

T. Kuprat, M. Schmidt & P. Nyhuis (2016). Model-based analysis of reassembly processes

within the regenration of complex capital goods. Procedia CIRP, 55:206{211.

H. Lander (1984). Or forum - the origin of operational research. Operations Research,

32(2):465{476.

L. Lin, B. Luo & S. Zhong (2017). Development and application of maintenance decisionmaking

support system for aircraft 

eet. Advances in Engineering Software, 114:192 {

207.

L. MacLean, A. Richman & M. Hudak (2018). Failure rates for aging aircraft. Safety, 4(7).

J. Patterson, R. Slowinski, F. Talbot & J. Weglarz (1989). An algorithm for a general class

of precedence and resource constrained scheduling problems. Elsevier, pp. 3{28.

P. Samaranayake & S. Kiridena (2012). Aircraft maintenance planning and scheduling: an

integrated framework. Journal of Quality in Maintenance Engineering, 18(4):432 { 453.

A. Schnabel, C. Kellenbrink & S. Helber (2017). Prot-orientated scheduling of resourceconstrained

projects with 

exible capacity constraints. http://diskussionspapiere.

wiwi.uni-hannover.de/pdf_bib/dp-593.pdf.

C. Shang & F. You (2018). Distributionally robust optimization for planning and scheduling

under uncertainty. Computers and Chemical Engineering, 110:53{68.

A. Sprecher (1994). Resource-constrained project scheduling: Exact methods for the multimode

case. Lecture Notes in Economics and Mathematical Systems, 409.

A. Sprecher & A. Drexl (1998). Multi-mode resource constrained project scheduling by a simple,

general and powerful sequencing algorithm. European Journal of Operational Research,

107:431{450.

A. Sprecher, S. Hartmann & A. Drexl (1997). An exact algorithm for project scheduling with

multiple modes. OR Spectrum, 19:195{203.

F. B. Talbot (1982). Resource-constrained project scheduling with time-resource tradeos:

the nonpreemptive case. Management Science, 28(10):1197{1210.

J. Van den Bergh, P. De Bruecker, J. Belien & J. Peeters (2013). Aircraft maintenance opera-

tions: state of the art. research paper, HUBRUSSEL, Warmoesberg 26, 1000 BRUSSELS,

Belgium.

W. J. C. Verhagen & L. De Boer (2018). Predictive maintenance for aircraft components

using proportional hazard models. Journal od Industrial Information Integration. In Press.

 

 

Universiteit of Hogeschool
Master of Science in Business Engineering - Operations Management
Publicatiejaar
2019
Promotor(en)
Professor Dr. M. Vanhoucke
Kernwoorden
Share this on: