De impact van real-time sensordata in onderhoudsplanning binnen de luchtvaartindustrie

Baptiste
Bovyn
  • Tom
    Servranckx

Het artikel werd opgesteld in Latex tekstverwerker en kan bijgevolg niet gekopieerd en geplakt worden. Gelieve het artikel als pdf-bestand in de bijlage terug te vinden, a.u.b.

Bibliografie

U. Besikci, U. Bilge & G. Ulusoy (2015). Multi-mode resource constrained multi-project

scheduling and resource portfolio problem. European Journal of operational Research,

240:22{31.

J. Clausen (1999). Branch and bound algorithms - principles and examples. Department of

Computer Science, University of Copenhagen, Universitetsparken 1, DK- 2100 Copenhagen,

Denmark.

E. Demeulemeester & W. Herroelen (1992). A branch-and-bound procedure for the multiple

resource-constrained project scheduling problem. Management Science, 38(12):1803{1818.

S. Hartmann (2001). Project scheduling with multiple modes: a genetic algorithm. Annals

of Operations Research, 102:111{135.

W. Herroelen, B. De Reyck & E. Demeulemeester (1998). Resource-constrained project

scheduling: a survey of recent developments. Computers Ops Res., 25(4):279{302.

F. S. Hillier & G. J. Lieberman (2015). Introduction to Operations Research. McGraw-Hill

Education, 10 edition.

L. Homann, T. Kuprat, C. Kellenbrink, M. Schmidt & P. Nyhuis (2017). Priority rule-based

planning approaches for regeneration processes. Procedia CIRP, 59:89{94.

S. Hogan (2011). A gentle introduction to computational complexity theory, and a little bit

more. http://www.math.uchicago.edu/~may/VIGRE/VIGRE2011/REUPapers/Hogan.pdf.

C. Kellenbrink & S. Helber (2015). Scheduling resource constrained projects with a 

exible

project structure. European Journal of Operational Research, 246:379{391.

C. Kellenbrink, F. Herde, S. C. Eickemeyer, T. Kuprat & P. Nyhuis (2014). Planning the

regeneration processes of complex capital goods. Procedia CIRP, 24:140{145.

U. Kohlmorgen, H. Schmeck & K. Haase (1996). Experiences with ne-grained parallel genetic

algorithms. http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.45.8861&

rep=rep1&type=pdf.

 

R. Kolisch (1996). Serial and parallel resource-constrained project scheduling methods revisited:

theory and computation. European Journal of Operational Research, 90:320{333.

T. Kuprat, M. Schmidt & P. Nyhuis (2016). Model-based analysis of reassembly processes

within the regenration of complex capital goods. Procedia CIRP, 55:206{211.

H. Lander (1984). Or forum - the origin of operational research. Operations Research,

32(2):465{476.

L. Lin, B. Luo & S. Zhong (2017). Development and application of maintenance decisionmaking

support system for aircraft 

eet. Advances in Engineering Software, 114:192 {

207.

L. MacLean, A. Richman & M. Hudak (2018). Failure rates for aging aircraft. Safety, 4(7).

J. Patterson, R. Slowinski, F. Talbot & J. Weglarz (1989). An algorithm for a general class

of precedence and resource constrained scheduling problems. Elsevier, pp. 3{28.

P. Samaranayake & S. Kiridena (2012). Aircraft maintenance planning and scheduling: an

integrated framework. Journal of Quality in Maintenance Engineering, 18(4):432 { 453.

A. Schnabel, C. Kellenbrink & S. Helber (2017). Prot-orientated scheduling of resourceconstrained

projects with 

exible capacity constraints. http://diskussionspapiere.

wiwi.uni-hannover.de/pdf_bib/dp-593.pdf.

C. Shang & F. You (2018). Distributionally robust optimization for planning and scheduling

under uncertainty. Computers and Chemical Engineering, 110:53{68.

A. Sprecher (1994). Resource-constrained project scheduling: Exact methods for the multimode

case. Lecture Notes in Economics and Mathematical Systems, 409.

A. Sprecher & A. Drexl (1998). Multi-mode resource constrained project scheduling by a simple,

general and powerful sequencing algorithm. European Journal of Operational Research,

107:431{450.

A. Sprecher, S. Hartmann & A. Drexl (1997). An exact algorithm for project scheduling with

multiple modes. OR Spectrum, 19:195{203.

F. B. Talbot (1982). Resource-constrained project scheduling with time-resource tradeos:

the nonpreemptive case. Management Science, 28(10):1197{1210.

J. Van den Bergh, P. De Bruecker, J. Belien & J. Peeters (2013). Aircraft maintenance opera-

tions: state of the art. research paper, HUBRUSSEL, Warmoesberg 26, 1000 BRUSSELS,

Belgium.

W. J. C. Verhagen & L. De Boer (2018). Predictive maintenance for aircraft components

using proportional hazard models. Journal od Industrial Information Integration. In Press.

 

 

Download scriptie (2.16 MB)
Universiteit of Hogeschool
Universiteit Gent
Thesis jaar
2019
Promotor(en)
Professor Dr. M. Vanhoucke